Boulenouar Wind Power Station is a major development project in Mauritania, aimed at providing renewable energy to the country. The power station is the largest wind power plant in Mauritania, with a capacity of 102.375 MW. The wind farm consists of 39 turbines manufactured by Siemens-Gamesa, each with a capacity of 2.625 megawatts.
The power station is owned by of the German conglomerate Siemens and the Spanish wind turbine manufacturer Siemens Gamesa. The development of the power station has been budgeted at 140 million euros, with a loan of 120 million euros committed by the Arab Fund for Economic and Social Development.
Play
Pause
Quick Facts
Diesel fuel savings: 34 million liters annually
CO2 Emission reductions: 99,225 tones annually
Homes powered: more than 100,000
WIND energy penetration: 40 percent into the grid
Project Info
CAPACITY : 100 MW
Technologies Used : Onshore wind farm
39 Siemens-Gamesa turbines, each with rated capacity of 2.625 megawatts.